Your browser is no longer supported

For the best possible experience using our website we recommend you upgrade to a newer version or another browser.

Your browser appears to have cookies disabled. For the best experience of MRW, please enable cookies in your browser

We'll assume we have your consent to use cookies, so you won't need to log in each time you visit our site.
Learn more

  • You are here:Kit

MRF now operational

The MRF provided by Machinex for Levenseat Renewable Energy’s energy-from-waste (EfW) plant in Lanark, Scotland, is now fully operational. The aim is to achieve a 98% diversion from landfill.

The system is processing 42 tonnes an hour of material, and is designed to produce a minimum of 100,000 tonnes a year of high- quality refuse-derived fuel (RDF) as a feedstock for the adjacent power plant, while also recovering high-value recyclables.

To meet the objectives of the plant, Machinex installed the latest technologies including shredders, a Machinex trommel, air separators, Mach ballistic separ­ators, Mach Hyspec optical sorting units for plastic and paper, a belt dryer and two Machinex single-ram balers.

www.machinextechnologies.com

 

 

Have your say

You must sign in to make a comment

Please remember that the submission of any material is governed by our Terms and Conditions and by submitting material you confirm your agreement to these Terms and Conditions. Links may be included in your comments but HTML is not permitted.