Your browser is no longer supported

For the best possible experience using our website we recommend you upgrade to a newer version or another browser.

Your browser appears to have cookies disabled. For the best experience of MRW, please enable cookies in your browser

We'll assume we have your consent to use cookies, so you won't need to log in each time you visit our site.
Learn more

Landfill in England to run out in seven years

England now has 6.8 years left of non-hazardous landfill life, based on 2016 inputs, according to the Environment Agency.

Newly published data for 2016 from permitted waste management operators in England shows a current overall picture of waste management activity in the country (see picture gallery).

It shows a steady increase in waste treatment capacity in England between 2009 and 2016, alongside a decrease in landfill capacity. 

England landfilled a total of 44.7 million tonnes in 2016 and managed a total of 203 million tonnes of waste. Last year there were 340 landfill sites accepting waste and 507 that were permitted, against 343 and 493 respectively the previous year.

On a regional basis, the east of England utilised the most landfill, at 10 million tonnes, while London used the least at 2.3 million tonnes. The south-east, followed by Yorkshire and the Humber, had the most remaining landfill capacity in non-hazardous merchant sites at the end of 2016.

Also decreasing was the number of metal recycling sites holding permits and the number accepting scrap. These have decreased year-on-year since 2014. In 2016 there were 1,244 metal recycling sites accepting waste, 46 fewer than 2014, or a 3.5% decrease.

Analysis of treatment facilities showed that the north-west had the most biological treatment activity and London the least. The capital also had the least incineration capacity, while the south-east had the most.

In terms of incineration input, the majority of incineration capacity across the various regions was used for municipal and/or commercial and industrial waste, with the exception of the east Midlands and east of England, where co-incineration of hazardous waste and animal by-products led respectively.

The data follows the recent release of reports within the industry concerning whether the country faces a future waste treatment capacity shortfall for residual waste or overcapacity. Biffa has warned of a capacity gap, as has Suez, while consultancy Eunomia predicts an overcapacity of energy-from-waste plants.

 

Readers' comments (2)

  • Such an eye-opening article. We really need to take this landfill situation seriously.

    Unsuitable or offensive? Report this comment

  • As a nation we generate vast amounts of waste . The focus should be on reducing waste and penalising companies that thrive on throw away articles. Incinerator companies say they offer a solution. They do not , to generate 1 kWh of incinerator electricity releases 1.5 kg of CO2 into the atmosphere. The average amount of CO2 generated per kWh of electricity in the U.K. Is currently less than 20% of this around 0.25 Kg . Incinerators will soon be taxed out of existence if the government is serious about fighting global warming.

    Unsuitable or offensive? Report this comment

Have your say

You must sign in to make a comment

Please remember that the submission of any material is governed by our Terms and Conditions and by submitting material you confirm your agreement to these Terms and Conditions. Links may be included in your comments but HTML is not permitted.